Saturday 23 March 2013

OCTOBER 2011 (History) TEACHER FALLS OFF BOAT

OCTOBER 2011
DISASTER STRIKES - Teacher falls off boat and breaks leg.

Mr Mayfield is off for nearly two terms and so the railway is put on hold.

By the time Mr M has caught up it is

MARCH 2012
Layout decisons - The biggest problem with the previous railway that Mr Mayfield made was that it was in 3 big sections. It took so long to set up and take down that it hardly got used.

The decision was taken to make a layout on one small board (1200 X 600mm)

As Mr Mayfield had lots of 009 stuff at home it was decided that the layout would be a 009 railway.

No comments:

Post a Comment